Case Study

De Gouverneur

Details:

Program/Function: Residential
Location: Rotterdam, The Netherlands
Year: 2014 (Design); 2016 (Completion)
Design Team: Architectuur MAKEN; Nina Aalbers; Ferry in ’t Veld; Koelman Bouw B.V. (Contractor); Pieters Bouwtechniek Delft (Structural Engineering); StoneCycling (Brick supplier)
Client: Nina Aalbers & Ferry in ’t Veld

Reuse Information:

  • The façade is made with WasteBasedBricks by StoneCycling, a material composed of visible construction and ceramic waste, including glass, toilet bowls, and roof tiles.

Link: